LIN Peng
Position:Professor
Address:Department of Hydraulic Eng., Tsinghua University,Beijing, China
Tel:86-010-62788102
E-mail:celinpe@tsinghua.edu.cn
Educational Background
BA: Sep.1991 – July.1995, Mining Eng., Northeastern University
MA: Sep.1995 – Mar. 1998, Mining Eng., Northeastern University
PhD: Sep.1998 – Jun.2002, Mining Eng., Northeastern University
Work Experience
2014/12-now,Prof., Depart. of Hydraulic Eng., Tsinghua University, China
2005/12-2014/12,Associate prof., Depart. of Hydraulic Eng., Tsinghua University, China
2004/06-2005/12,Assistant prof., Depart. of Hydraulic Eng., Tsinghua University, China
2002/05-2004/05,Post doctoral Research Fellow, Depart. of Hydraulic Eng., Tsinghua University, China
1998/10-2001/04,Research Assistant, Depart. of Civil & Structural Eng., The Hong Kong Polytechnic University
Teaching Courses
1. Building Construction
2. Designin Building Construction
Research Interests
1. 2014,The Second Class DAYU Science and Technology Advances Award, Chinese Hydraulic Engineering Society, 2014.(The first winners)
2. 2014,The First Class Science and Technology Advances Award, ministry of education,China (The second winners)
3. 2015,The second prize ofScience and Technology Advances Award,(The third winners)
4. 2014,The grand prize ofScience and Technology Advances Award, China Society for Hydropower Engineering.(The tenth winners)
5. 2010,Silver Prize of Young Scientists in Science and Technology,Chinese Society for Rock Mechanics and Engineering (CSRME)
Research Projects
1. Cracking and failure behavior of brittle medium
2. Crackingmechanismandcracking control of high arch dam
3. Overall stability assessment of dam-foundation, high slope and underground excavation
4. Intelligent cooling control and greenconstruction oflarge dam
Professional Service
1. Editorial member: Rock mechanics and rock engineering,2016-now
2. Editorial member: Tunnelling and Underground Space Technology, 2015-now
3. Editorial member: Chinese Journal of Rock Mechanics and Engineering, 2014-now
4. Council Member: Chinese Society for Rock Mechanics and Engineering (CSRME),2009-now.
5. Corresponding Member: International Society for Rock Mechanics (ISRM), 2008-now.
6. Secretary: Professional Committee of Numerical Simulation and Physics Test of CSRME, 2004-now.
7. Vice president: Youth Working Committee, of CSRME, 2011-now.
Honors and Awards
1. Study on performance evolution and mechanical- electromagnetic effects of rock mass containing defects, National Natural Science Foundation of China(NNSF), 2013-2016
2. Experimental and damage localization reinforcement theoretical study on rock mass containing three dimension flaws, NNSF, 2008-2010
3. Brittle failure behaviour of medium containing 3D flaws and pores, NNSF, 2005
4. Sub.item of: Researches on life-cycle safety control on high-steep rock slopes in hydropower engineering, National Basic Research Program of China (973 Program), 2011-2015
5. Study on failure mechanism and seismic safety evaluation methods of slope, Ministry of Water Resources, 2010-2013
6. Study on cracking control theory and technology of concrete high dam Tsinghua University, 2011-2014
7. Research and equipment develop on intelligent cooling control system for Xiluodu arch dam, China Three Gorges Corporation(CTGC)Project, 2011-2014
8. Development of monitoring and simulation analysis system of Xiluodu arch dam, CTGC Project, 2011, 2013
9. Study on the overall safety standard system of super high arch dam based on geo-mechanical model test,Chengdu Hydroelectric Investigation & Design Institute of SPC, CHIDI, 2015-2016
10. Study on the overall safety standard system of super high arch dam based on 3D Nonlinear FEM analysis,Chengdu Hydroelectric Investigation & Design Institute of SPC, CHIDI, 2015-2016
11. 3D FEM analysis on overall stability of Yebatan arch dam, Chengdu Hydroelectric Investigation & Design Institute of SPC, CHIDI, 2015-2016
12. 3D FEM analysis on overall stability of dam and underground house of Wudongde arch dam, Yangtze River Survey Planning Design and Research Institute Co. Ltd(YRSPDRI) Project, 2011-2012
13. 3D FEM analysis on overall stability of Wudongde arch dam considering bank reinforcement, YRSPDRI, 2015-2016
14. 3D FEM analysis on overall stability of Xulong arch dam, YRSPDRI, 2014-2016
15. Overall stabilityevaluation of Xiluodu arch dam and safety review, Chengdu Hydroelectric Investigation & Design Institute of SPC, CHIDI, 2008-2009
16. Reinforcement design and stability analysis for large-span tailrace bifurcated tunnels of Xiluodu project, Chengdu Hydroelectric Investigation & Design Institute of SPC, CHIDI, 2006-2007
Academic Achievement
1. Peng Lin, Xiaoli Liu, Senyin Hu, Pujian Li, Large deformation analysis on a high slope relating to the Laxiwa reservoir, China, Rock Mech. and Rock Eng., 2016, DOI: 10.1007/s00603-016-0925-0
2. Peng Lin, Robina H.C.Wong, Chunan Tang, Experimental study of coalescence mechanisms and failure under uniaxial compression of granite containing multiple holes, Int. J. of Rock Mech. and Min. Sci., 2015, 313-327, DOI: 10.1016/j.ijrmms.2015.04.017
3. Peng Lin, Bo Huang, Qingbin Li, Renkun Wang, Hazard and seismic reinforcement analysis for typical large dams following the Wenchuan earthquake, Eng. Geo.,2015, 194, 86-97, DOI:10.1016/j.enggeo.2014.05.011
4. Peng Lin, Zhou Weiyuan, Hongyuan Liu, Experimental study on cracking, reinforcement, and overall stability of the Xiaowan super-high arch dam, Rock Mech. and Rock Eng., 2015, 48( 2): 819-841, DOI: 10.1007/s00603-014-0593-x
5. Peng Lin, Xiaoxu Zhu, Qingbin Li, Hongyuan. Liu, Yongjun Yu, Study on optimal grouting timing for controlling uplift deformation of a super high arch dam, Rock Mech. and Rock Eng.,2016,49(1), 115-142, DOI: 10.1007/s00603-015-0732-z
6. Peng Lin, Hongyuan Liu, Weiyuan Zhou, Experimental study on failure behavior of deep tunnels under high in-situ stresses, Tunnel.Underg.Space Technol., 2015, 46, 28-45, DOI:10.1016/j.tust.2014.10.009
7. Peng, Lin, Xiaoli Liu, Weiyuan, Zhou, Renkun, Wang, Shanyong,Wang, Cracking stability and slope reinforcement analysis relating to the Jinping dam based on a geomechanical model test, Arabian J. of Geosci.,2015, 8(7), 4393-4410
8. Peng Lin, Tianhui Ma, Zhengzhao Liang, Chun An Tang, Renkun Wang. Failure and overall stability analysis on high arch dam based on DFPA code, Engineering Failure Analysis, 2014,45:164-184, DOI: 10.1016/j.engfailanal.2014.06.020
9. Peng Lin, Yaneng Zhou, Hongyuan Liu and Chen Wang, Reinforcement design and stability analysis for large-span tailrace bifurcated tunnels with irregular geometry, Tunnel.Underg.Space Technol.,2013. 38(9): 189-204, DOI: 10.1016/j.tust.2013.07.011
10. Peng Lin, Qingbin Li, Qixiang Fan, Xianyou Gao, Real-time monitoring system for workers’ behaviour analysis on a large-dam construction site, Int. J. of Distributed Sen. Networks,Article ID 509423, 10 pages, 2013. doi:10.1155/2013/509423
11. Hancheng Jiang, Peng Lin, Maoshan Qiang, Qixiang Fan, A labor consumption measurement system based on real-time tracking technology for dam construction site, Authom. Contr., 2015, 52, 1–15, http://dx.doi.org/10.1016/j.autcon.2015.02.004
12. Danni Luo, Peng Lin, Qingbin Li, Dong Zheng, Honguan Liu, Effect of the impounding process on the overall stability of a high arch dam: a case study of Xiluodu dam, China, Arabian J. of Geosci., 2015,8(11),9023-9041, DOI:10.1007/s12517-015-1868-6
13. Robina H.C.Wong, Peng Lin, Numerical study of stress distribution and crack coalescence mechanisms of a solid containing multiple holes, Int. J. of Rock Mech. and Min. Sci., 2015,79,41-54, DOI:10.1016/j.ijrmms.2015.08.003
14. Robina H.C.Wong,Peng Lin, Chunan Tang, Experimental and numerical study on splitting failure of brittle solids containing single pore under uniaxial compression, Mechanics of Materials,38,142-159,2006
15. Robina H.C.Wong,Peng Lin,Chunan Tang,Chau, K.T. Creeping damage around an opening in rock-like material containing non-persistent joints,Engineering Fracture Mechanics, Vol 69, 2015-2027, 2002
16. Peng Lin, Hang Hu, Qingbin Li, Cheng Wang, Field test on evolution of real thermal field of mass concrete, J T singhua U niv (Sci & Tech), 2015,01:27-32
17. S.G.She, P. Lin, Some developments and challenging issues in rock engineering field in china, Chinese Journal of Rock Mechanics and Engineering, 2014, 33(3): 433-457(in Chinese)
18. P. Lin, C. Wang, Y.H. Weng, Q.X. Cao, Q.Y.Hu, Interaction mechanism analysis on overall stability of super-high arch dam and underground powerhouse,Chinese Journal of Rock Mechanics and Engineering,2014, 33(11):2236-2246(in Chinese)
19. P. Lin, Q.B. Li, S.W. Zhou, Y. Hu, Intelligent cooling control method and system for mass concrete, Chinese Journal of Hydraulic Engineering, 2013, 44(8), 950-957(in Chinese)
20. P. Lin,X.L. Liu ,Y. Hu, W. B. Xu, Q.B. Li, Deformation and stability analysis on xiluodu arch dam under stress and seepage condition, Chinese Journal of Rock Mechanics and Engineering, 2013, 32(6),1137-1144(in Chinese)
21. P. Lin, S.Z. Kang, C.Wang, D. Zheng, Experimental research on electromagnetic effects from self-expansion cracking of granite, Chinese Journal of Rock Mechanics and Engineering, 2013 ,32 (11): 2196-2204(in Chinese)
22. P. Lin, S.Z. Kang, Q.B. Li,R.K. Wang, Z.L. Wang, Evaluation on rock mass quality and stability of xiluodu arch dam under construction phase, Chinese Journal of Rock Mechanics and Engineering,2012, 31 (10), 2042-2052(in Chinese)
23. P. Lin, R.K. Wang, S.Z. Kang, H.C.Zhang, W.Y. Zhou, Study on key problems of foundation failure, reinforcement and stability for super high arch dams, Chinese Journal of Rock Mechanics and Engineering,2011,30(10),1945-1958(in Chinese)
24. Lin, P., Brittle failure behaviour of medium containing flaws and pores,Journal of Rock Mechanics and Engineering (in Chinese), 21(8),1283,2002
25. P. Lin, Q.B. Li, et al, Pipeline internal temperature measuring device (Authored patents,ZL2012102998066)
26. P. Lin, Q.B. Li, et al,Integral flow and temperature control device (Authored patents,ZL2012102999976)
27. P. Lin, Q.B. Li, et al,System and method for intelligent water supply temperature control test (Authored patents,ZL2012103014806)
28. Q.B. Li, P. Lin, et al,Method and system for intelligently controlling temperature of concretes of dam under construction (Authored patents, ZL 201210289192.3)
29. Q.B. Li, P. Lin, et al,Real-time online individualized heat-exchanging intelligent temperature control system of mass concretes (Authored patents, ZL 201210298994.0)
30. S.W. Zhou, P. Lin,et al,Movable real-time multipoint temperature acquisition device for dam (Authored patents, ZL201210299661.X)
31. S.L.Huang, P. Lin, et al, Monitoring device for electromagnetic effects(Authored patents, ZL 201210507744.3)